- Howell Enterprises, HOME
-
-
- PRODUCTS
- BACKGROUND
- CONTACT US
JOBS
TESTS
-
-
|
KALMATRONŽ KF-B
Page 3
TECHNICAL DATA OF CONCRETE
WITH KF-B
| Setting time |
15-45 minutes |
| Final hardening |
4 hours |
| Minimum temperature on site |
-5°C (23°F) |
| Porous penetration on depth |
15 cm (6") |
| Freeze-thaw resistance up to |
200 cycles |
| Shrinkage as low as |
0.007% |
| Flexural strength 28 days up to 35% |
 |
| Tensile strength 28 days up to |
60% |
| Impermeability |
14 ATM-100%
|
COMMENT
The main properties of protected concrete are not
changed after accidental removal of the KF-B layer.
Top of Page
Feedback
© Copyright 2000-2007 Howell Enterprises. All Rights Reserved.
Site Strategy and Design by Brazil
Business Services
|