Howell Enterprises, HOME
 
 
PRODUCTS

 

BACKGROUND


CONTACT US


JOBS

 

TESTS



 


 

KALMATRONŽ KF-C

Page 3

TECHNICAL DATA OF CONCRETE WITH KF-C

Setting time 5-15 minutes
Final hardening 25 to 40 minutes
Minimum temperature on site -5°C (23°F)
Shrinkage as low as 0.0005%
Impermeability 100%

Next Page

Top of Page

© Copyright 2000-2007 Howell Enterprises.  All Rights Reserved.

Site Strategy and Design by Brazil Business Services